Innopoli II |
Innopoli II
Innopoli II is located in the Otaniemi technological centre, between Otaniemi and Ring Road I. The office building was completed in 2002, and its total floor area is approximately 23,000 m². YIT Construction Ltd was the main contractor.
The internals of Innopoli II are dominated by the atrium court in connection with the entrance. The atrium is six floors high at most and has glass roofing. Around the atrium court, there are facilities such as a 200 seat lecture and conference hall and several cabinets and meeting rooms.